Sustainable Engineering Group was hired to conduct facility energy assessments in the majority of the 3 million ft² hospital. We were hired to identify opportunities to reduce electrical energy consumption to the hospital while maintaining or improving the facility’s operations, comfort and indoor air quality. Sample issues identified are opportunities for scheduling, demand control ventilation, simultaneous heating and cooling, lack of airflow to zones, too high static pressure in ducts, optimization of air economizer and humidifier operation, and more efficient staging of chilled water pumps.